RAS, RAP & Cold Feed Bins

Features & Benefits
We offer multiple RAP and RAS & Cold Feed Bin design options.
- Secure railed walkway for easy bin access during maintenance and inspections available
- Steep side walls for efficient material handling
- Bin steel walls are constructed with 1/4-inch-thick steel plating
RAS Bins
RAS (Recycled Asphalt Shingles) bins are steep providing a flow of even the finest RAS in hot weather. Bin walls consist of a main vertical end-wall and a sloped end-wall to help the RAP flow easily.
RAP Bins
Working directly with our customers to help them dial in a Recycled Asphalt System and fit in to an existing site as required.
Cold Feed Bins & Hoppers
Working directly with our customers, we can build a complete system, or easily add on to an existing cold feed line. Duplicate your bin, extend the feed conveyor and paint it to match the existing system.
Supporting Sustainability
At Argo we appreciate our customers and also share our client’s desire to achieve sustainability. HMA (hot-mix asphalt) developed with RAP or RAS saves energy. RAP/RAS bin construction is part of the sustainable production of recycled products and leads to environmental stewardship based on the following:
- RAP/RAS reduces the need for virgin aggregate and composites that are non-renewable
- By eliminating the need for extracting non-renewable aggregates energy is also saved
- RAP/RAS discourages retired pavement materials being placed in a landfill
- RAP/RAS supplements virgin aggregates and binders


Before Rebuild

After Rebuild
Bin Restoration
If you need to restore your current RAP, RAS, or cold feed bins we have the capabilities. Many customers save cost by having their recycle bins restored from the ground up or even painted. We have what it takes to restore any cold feed bin system saving you time and money.
Featured Projects
Cold Feed Bins & Hoppers
Working directly with our customers to help them dial in Custom Fabrication Design to achieve the exact output they desire is the Argo difference.
RAP Bins
Working directly with our customers to help them dial in a Recycled Asphalt System Design to achieve the exact output they desire is the Argo difference.
RAS Bins
RAS (Recycled Asphalt Shingles) bins are steep providing a flow of even the finest RAS in hot weather. Bin walls consist of a main vertical end-wall and a sloped end-wall angled at 70 degrees. Finely grade RAP flows easily with this RAS bin construction design.
Replacement Parts
TeePee Flights
TeePee Combustion Flights are constructed of ¼” Abrasion Resistant formed steel x 43-1/2″ standard length.
A Clips
Image shows close-up of A-Clip and A-Clip Protector
Double Castle Flights
OEM Replacement Double Castle Flights